From Fermilab Today: “Fermilab’s MicroBooNE begins detector construction”

Fermilab is an enduring source of strength for the US contribution to scientific research world wide.

Brad Hooker
Friday, March 30, 2012

“Fermilab’s neutrino experiment, MicroBooNE, is beginning the full construction phase for the detector, after DOE announced the official Critical Decision 3b approval on March 29.

‘This is a significant milestone for the MicroBooNE project,’ said project manager Gina Rameika, noting that the next step in the DOE CD process will be CD 4, which is approval to start operations, planned for mid-2014.

In the last phase of the project, the MicroBooNE collaboration began acquiring precision-made parts for the detector from institutions like Brookhaven National Laboratory, Syracuse University and Yale University. Soon the team will begin assembling those pieces.

The inner time projection chamber, which will provide three-dimensional reconstructions of neutrino events, will soon begin assembly within the DZero building, a former experiment hall for the Tevatron. When this is finished, the 33-foot-long TPC will slide into a cryostat-cooling chamber and move to its new housing at the Liquid Argon Test Facility, currently under construction at Fermilab. Once there, scientists will begin tracking neutrinos with liquid argon, allowing high sensitivity for the experiment.”

lbne
The MicroBooNE experiment at Fermilab will detect neutrinos with a time projection chamber that holds about 100 tons of liquid argon cooled to minus 187 degrees Celsius. The TPC will be 12 meters long and have a width and height of 2.5 meters. Credit: Fermilab

See the full article here.


Wilson Hall